Risk Register, step by step
A live document, not an appendix written once and filed.
- Identify the risksWorkshop it with the people who will actually do the work.
- Score likelihood and impactOne agreed scale, so that two risks can be compared at all.
- Decide the responseAvoid, reduce, transfer or accept, with the reason written down.
- Name an owner and a dateA risk with no owner is a risk that nobody is managing.
- Price what is leftResidual risk feeds the contingency, and optimism does not.
- Review on a cycleClose what has passed, add what the work has since revealed.
Educational reference. Risk allocation between the parties is contractual. Take legal and insurance advice on it.
Questions about the Risk Register poster
- What’s on the Risk Register poster?
- 6 numbered steps. A live document, not an appendix written once and filed. Identify the risks — Workshop it with the people who will actually do the work.; Score likelihood and impact — One agreed scale, so that two risks can be compared at…; Decide the response — Avoid, reduce, transfer or accept, with the reason written down.; Name an owner and a date — A risk with no owner is a risk that nobody is managing.; Price what is left — Residual risk feeds the contingency, and optimism does not.; Review on a cycle — Close what has passed, add what the work has since revealed.. Educational reference. Risk allocation between the parties is contractual. Take legal and insurance advice on it.
- Who is the Risk Register poster for?
- Risk Register belongs to the Civil Engineering section rather than to a school year, because engineering is not something one grade owns. Anyone learning construction management can pin it up — a beginner, a student mid-course, or someone revising years later.
- When should you use the Risk Register poster?
- At project start, and at every review after it. A wall chart earns its place by being glanceable from where the work is happening, so Risk Register belongs on the wall where that engineering work actually happens, within glancing distance, rather than filed away.
- What other posters go with Risk Register?
- Cost Estimating, Critical Path Method and Earned Value sit alongside Risk Register in the Civil Engineering section. Printed together they make a wall rather than a single sheet, which is how a reference set actually gets used.Cost EstimatingCritical Path MethodEarned Value
- Is the Risk Register poster free to download and print?
- Yes. Risk Register downloads as a free PDF with no account, no email and no watermark, like everything else in the Civil Engineering section. Print as many copies as you like for a home, a classroom, a library or a tutoring group; reselling the file is the only thing the licence rules out.Read the licence
- What size does the Risk Register poster print at?
- Risk Register is a vector PDF laid out for US Letter, and prints on A4 with Fit to page — the same file, no separate download. Because every mark on it is drawn rather than photographed, it stays sharp enlarged to A3, A2 or A1 at a copy shop. Colour carries emphasis only, so a greyscale print of Risk Register loses nothing.Printing guide
Related posters
Charts that sit alongside Risk Register on the same wall.
Browse every Civil Engineering poster, or start from the full catalogue.